August 29, 2018 – It was time to start with all of the engine hookups.
I took the box from Vetterman out of my bedroom into the garage, and did a quick inventory. I had to run out and get some high-temp anti-seize, then I attached the pipes to the cylinders. Their instructions say to start with 3 and 4, then install 1 and 2.
The pipes are in place, but not yet torqued. I still have to install the crossover tailpipes.
Time: 1:00

