Worked on tailwheel mount

December 31, 2014 – I got my tailwheel parts back from the powder coater, so I wanted to get the tailwheel mount going.

I clecoed the bracket and the bulkheads into the tailwheel skin, then started to ream up the bolt holes in the forward bulkhead. The holes started at #30, so I used core drills to take them first to .189″, then .248″.

123114001 123114002 123114003

Here is the bracket clecoed into place:

123114004

 

For what it’s worth, I took out the clecoes from the bracket so I could access the rivets for the forward of the two bulkheads. LJ helped me shoot those rivets. What a pain…

After everything was riveted, I put the bracket back in place and installed the bolts and the two keeper rivets:

123114005 123114006 123114007 123114008

Then I wrestled the assembly into the aft end of the aft fuselage, hopefully for the last time…

123114009 123114010

Now I just have a lot of riveting to do.

Time: 2:55

Leave a Reply

Your email address will not be published. Required fields are marked *