Continued Interior Install
October 22, 2021 – I continued with the installation of the interior. I’ve been holding off on the baggage compartment because I have had to work under the panel because of the fuel tank issues, but I’m convince that my wiring is not at fault.
I laid down the carpet in the baggage compartment, then the carpet on the sides.
The upper sidewalls form pockets on each side, which I think will be handy. These pieces were a bit confusing at first, but I finally figured it out.
These attach at the aft bulkhead and around the F705 bulkhead. There are two screws that will go to rivnuts in the F705.
The pockets are lined with material that velcroes to the longitudinal formers and the skin above the side carpeting.
I got these done on the left side, I’ll do the right side on Monday.
Time: 2:20