Elevator Leading Edges
May 19, 2010 – Well, I got the leading edges rolled on both elevators. The central section of each elevator was a particular pain because the skin bulged between the rivet holes. So I decided to add fasteners between the existing ones in that section.
The spacing between rivets in this area is huge for 1/8″ rivets, so adding fasteners was not a problem.
I finally got some uninterrupted time to mix sealant for both leading edges and to install the fasteners. As was the case with the rudder, adding sealant made things much more difficult, because the sealant got all over the place while I was trying to squeeze the two halves together AND install clecos.
Finally got it together, and got the rivets installed. Let it sit overnight, and I wiped away the excess sealant, trying to get a nice edge seal for the seam in the process.
Next I’ll be installing the rod ends for the hinges, and test fit the entire empennage.
I’ve also decided that I’m going to try to go to Oshkosh this year. Never been. I’m trying to find a ride. If this year doesn’t happen, that’s fine. I’ve also got things going on with the house, so things are slowing down a little bit on the airplane.
Time : 4:35