August 20, 2015 – I finished the baggage compartment bulkheads this week.
Since I had all the screw holes back-drilled through the F706 bulkhead, I needed to do the rivet holes for the nutplates. I took the bulkhead panels out, and used a nutplate jig to drill all the rivet holes, then I installed all the nutplates.
I drilled and installed the wear blocks for the shoulder harness cables.
After this was all done I temporarily installed the bulkhead panels in place.
Time: 1:35