Entire Build Index
- Cockpit
- Work after First Flight
- Prep for First Flight
- Started Interior
- Received the Seats and Interior!
- Aileron Trim
- Installed F704 Bulkhead Covers
- Brakes!
- Repaired Armrest
- Panel Prep and Wiring
- Connecting Wing Wiring
- Panel Progress
- Avionics and Wiring
- Avionics and Wiring (again)
- More Cockpit Work
- Throttle Quadrant Installed
- Finished Cockpit Fuel Lines
- Throttle Cable
- Continued Cockpit Fuel Lines
- Cockpit fuel system
- Continued center section cover
- Started center section cover
- Installed headset jacks
- Cockpit Air Vent Brackets
- Painted Sub-Panel assembly
- Continued slider canopy frame fitting
- Started fitting canopy frame
- Drilled windshield roll bar
- Started windshield roll bar
- Started aileron trim
- Replaced brake lines in cockpit
- Installed F789 elevator pushrod
- Installed elevator bellcrank
- Worked on fuel selector valve
- Sub-panel and throttle quadrant
- Some small fuselage stuff
- Continued sub-panel structure prep
- Started sub-panel structure
- Installed air vent scoops and static ports
- Started elevator rods
- Orders and deliveries...
- Miscellaneous assembly and prep
- Finished flap mechanism
- Prepped flap mechanism parts
- Continued center covers
- Started flap mechanism
- Started center covers
- Finished seats
- Continued seatbacks
- Continued seat pans and other cockpit items
- Started seat attach hinges on seat pans
- Finished canopy decks and gussets
- Canopy decks and skins
- Fitted canopy decks and gussets
- Finished armrests