October 14, 2015 – Since I mis-drilled the locations for the static ports, I have to engineer a fix to route the tubing.

The static ports are supposed to be in front of the bulkhead; I drilled the holes behind. So the tube that runs forward needs to be routed past the bulkhead. I’m making an angle to hold the t-fitting, and drilled a hole through the bulkhead so the tubing has a straight run.

I think this setup will work fine. Note that this is not done yet; the pictures show a roughly cut bracket in place.

101415015 101415016

Time: :50

Leave a Reply

Your email address will not be published. Required fields are marked *